accomplishment
1996
investor
Rewe
type of construction
stick system facade, frame constructions
type of building
administrative
general contractor
Züblin Mayreder
project volume of the facade
0–1,9 mil. EUR
REWE built its distribution warehouse facility next to exit 8 of D11 highway. For Züblin, a general contractor, Sipral provided a complex delivery of glazed structures in the exterior and interior.
These were windows leading to the warehouse hall administrative part, the entrance glazed facade running along the whole height of the main staircase, entrance space and polygonal glazing of the entry porter´s lodge.
In the inner corridor there was built a partition of fire resistance to separate the administrative and storage parts of the hall. Sipral installed eight fire-resistant (EI 60) windows in the partition.
Several years later Sipral built its new production and logistics centre opposite these premises.